For the first time in Macedonia, Experts is presenting a technology ...
For the first time in Macedonia, Experts is presenting a technology that is applied on a world scale – aluminium pipes and connectors intended ...
Professionalism is a lasting value our professionalism is at your service.
Professionalism is a lasting value our professionalism is at your service.
...We don't offer just product we offer solutions.
We don't offer just product we offer solutions.
...Our commitment is continious improvement and competitiveness.
Our commitment is continious improvement and competitiveness.
...A significant part of the industry in the Republic of Macedonia uses Experts’ services and technological solutions.
Experts is present in more than 2,000 factories, production plants and other users in cities and urban areas, in all industries throughout the territory of the Republic of Macedonia, as well as in several facilities in Kosovo.
The most important projects carried out by Experts on turnkey principle include:
COMPLETED TURNKEY PROJECTS |
||||
Client |
Location |
Total installed power |
Carried out within a period of |
Description |
JUGOHROM Ferroalloys |
TETOVO Jegunovce |
500kW |
12 weeks |
Complete compressor station including dust collectors, control shutters, automatic operation mode of temperature and pressure. Automatic operation mode controllers for the compressors, dryers and filters. Pipeline with steel pipes DN100. |
REK OSLOMEJ |
KICHEVO |
250kW |
10 weeks |
Compressor and pipeline with steel pipes DN100, water cooled and complete electrical works. |
VITAMINKA |
PRILEP |
160kW |
12 weeks |
Complete compressed air solution, dryers, tanks, electrical and mechanical connection. Polypropylene pipeline for the new plant in length of 600 meters, and machine connection. |
TE-TO |
SKOPJE |
110kW |
12 weeks |
Delivery , monitoring of the complete installation and commissioning. |
PROTOTIP |
SKOPJE |
30kW |
12 weeks |
Complete solution for the compressed air, compressor equipment, downstream equipment, tanks, electrical and mechanical connection. A pipeline made of polypropylene pipes for the entire factory, in length of approximately 1000 meters. |
VARDAR DOLOMIT |
GOSTIVAR |
44kW |
6 weeks |
Complete compressor station including compressors and downstream equipment, electrical and mechanical connection. |
FENI INDUSTRI |
KAVADARCI |
1000kW |
12 weeks |
Delivery, monitoring of the installation and commissioning. |
KEMET ELEKTRONIKS |
SKOPJE
|
220kW |
13 weeks |
Complete compressed air solution, 100% oil-free compressors, downstream equipment, electrical and mechanical connection. Closed cooling system for the compressors with glycol coolers. Aluminum installation DN100 for the complete factory. |
Professionality is a lasting value….
……our professionality is at your service.